国产用力吃奶精品夜夜夜|色欲久久精品亚洲秘一区二区|精品欧美亚洲精品|少妇裸体婬交视频免费看高清

濟南誠耐金屬制品有限公司

濟南誠耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計服務(wù)團(tuán)隊,真誠為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

聯(lián)系我們

企業(yè)名稱:濟南誠耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟南市歷城區(qū)小清河南路8288號

當(dāng)前位置:首頁 »資訊中心 » 新聞資訊電梯門套安裝中需要注意什么?

電梯門套安裝中需要注意什么?

來源:http://m.zjy168.com/ 瀏覽:0發(fā)表時間:2024-03-07

在安裝時先要將各層需要的石材挑選好。根據(jù)尺寸、顏色和花紋來搭配,然后搬運到各個樓層需要使用的地方。

When installing, it is necessary to first select the required stones for each layer. Match according to size, color, and pattern, and then transport to the required locations on each floor.

在安裝時要注意石材的紋理,盡量保持色澤一致,紋理連貫。安裝完成之后,電梯門套的美觀性才會較佳。

During installation, attention should be paid to the texture of the stone, and efforts should be made to maintain consistent color and coherent texture. After installation, the aesthetics of the elevator door frame will be better.

彈線的時候要仔細(xì)測量,不僅一個門套要做好垂直和平整性,每個門套之間也要注意這些問題。

When drawing lines, careful measurement should be taken. Not only should one door frame be vertical and flat, but also attention should be paid to these issues between each door frame.

在安裝側(cè)板和線條時,要保證少有2個掛件作為支撐件。安裝角鋼的位置要測量準(zhǔn)確,在中間增加一個加固點的點位。這樣做是為了讓門套石材更加穩(wěn)定、牢固。

When installing the side panels and lines, it is necessary to ensure that there are at least 2 hanging parts as support components. The installation position of the angle steel should be accurately measured, and a reinforcement point should be added in the middle. This is to make the door frame stone more stable and firm.

20230531120627640.jpg

安裝時不要靠得太緊,在電梯門框邊預(yù)留5mm到8mm的位置,注意讓四周的預(yù)留位保持一致。

When installing, do not lean too tightly. Leave a 5mm to 8mm space on the edge of the elevator door frame, and ensure that the reserved space around is consistent.

在安裝檻石時,地磚和電梯框邊要有3mm左右的坡度,門框邊和頂面石材外口要有2mm左右的斜度。

When installing threshold stones, there should be a slope of about 3mm between the floor tiles and elevator frame edges, and a slope of about 2mm between the door frame edge and the outer opening of the top stone.

頂面線條碰和側(cè)面線條的角度為45°,碰角做到嚴(yán)密、平整,施工時注意縫隙內(nèi)不留余膠。如果有余膠就及時清理掉,然后使用勾縫劑處理。線條大小一致,造型穩(wěn)合整體風(fēng)格。

The angle between the top line and the side line is 45 °, and the angle should be tight and flat. During construction, attention should be paid to leaving no adhesive residue in the gaps. If there is any excess glue, clean it up in a timely manner and then use a pointing agent for treatment. The line size is consistent, and the shape is stable and in line with the overall style.

在使用云石膠打點之后,還要使用專用的AB膠固定,這樣才能確保穩(wěn)定性。

After using marble glue for dotting, special AB glue should also be used for fixation to ensure stability.

全部安裝完成后,即使進(jìn)行現(xiàn)場清理工作,還有做好調(diào)色勾縫處理。還要注意對石材陽角的保護(hù),用泡沫護(hù)角將它包裹起來。這樣能避免受到碰撞損壞。

After all installations are completed, even if on-site cleaning work is carried out, color matching and jointing treatment should be done well. Pay attention to the protection of the external corner of the stone, and wrap it with foam corner protectors. This can avoid collision damage.

本文由菏澤拉絲不銹鋼電梯門套線提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點擊我們的網(wǎng)站http://m.zjy168.com,我們將會全心全意為您提供滿意的服務(wù)。

This article provides technical support from Heze brushed stainless steel elevator door frame line. For more detailed and exciting content, please click on our website http://m.zjy168.com We will wholeheartedly provide you with satisfactory service.